Ensure rapid air transfer and bulletproof pressure retention for your largest equipment.
The vital operational center of your Super Large Bore systems. Arriving fully equipped with the internal valve core and a protective cap, this heavy-duty housing threads perfectly into your SLB spuds or flexible extensions to facilitate massive airflow. By drastically minimising the time it takes to inflate or deflate massive off-the-road (OTR) tyres, this complete assembly keeps your earthmoving fleet out of the maintenance bay and actively producing on the job site.
Features & Benefits:
- Arrives complete with a pre-installed valve core and protective cap for immediate, hassle-free installation
- Maximises airflow capacity to significantly reduce inflation and deflation times on massive OTR tyres
- Precision engineered to thread seamlessly into Super Large Bore spuds and flexible extension lines
- Heavy-duty metal construction withstands extreme operating pressures and harsh mining environments
SLB CORE HOUSING (COMPLETE)
UltraForce - Haltec
C-SLB-520 - R-520



