top of page

Establish a rock-solid, threaded foundation for your high-capacity tyre systems.

 

Providing the essential, leak-proof base required for maximum-airflow Super Large Bore assemblies. Engineered to thread directly into standard 1/2" NPT-tapped rim holes, this rugged component creates a fortified seal that easily withstands the crushing pressures of underground operations and open pit mining. By securing your high-volume air lines right at the wheel, it significantly reduces inflation times and keeps your heaviest earthmoving equipment operating safely and efficiently.

 

Features & Benefits:

- Precision threaded to lock seamlessly into standard 1/2" NPT rim holes

- Delivers the crucial, high-capacity foundation for Super Large Bore (SLB) inflation systems

- Heavy-duty metal construction resists extreme vibration and abrasive industrial wear

- Maximises airflow to slash inflation and deflation times on massive OTR tyres

SLB Screw in Spud

SKU: C-SLB-100
Quantity
UltraForce
bottom of page